Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 43 results ...

Abraham, D M (1990) A state-based framework using indicators for construction monitoring and evaluation, Unpublished PhD Thesis, , University of Maryland, College Park.

Ahrari, A (2012) A decision support system for dynamic integrated project scheduling and equipment operation planning, Unpublished PhD Thesis, , University of Maryland, College Park.

Akar, G (2009) Analysis of activity choice: The role of activity attributes and individual schedules, Unpublished PhD Thesis, , University of Maryland, College Park.

Al-Fadhala, M M (2002) Uncertainty-based condition assessment of existing concrete structures, Unpublished PhD Thesis, , University of Maryland, College Park.

Al-Wazeer, A A-R (2007) Risk-based bridge maintenance strategies, Unpublished PhD Thesis, , University of Maryland, College Park.

Avetisyan, H G (2013) Sustainable infrastructure modeling and policy analyses: Construction, energy and transportation industries, Unpublished PhD Thesis, , University of Maryland, College Park.

Bai, L (2013) RFID sensor-driven structural condition monitoring in integrated building information modeling environment, Unpublished PhD Thesis, , University of Maryland, College Park.

Bender, W J (2000) A risk-based cost control methodology for constructing complex structures with the mobile offshore base as a case study, Unpublished PhD Thesis, , University of Maryland, College Park.

Chelson, D E (2010) The effects of building information modeling on construction site productivity, Unpublished PhD Thesis, , University of Maryland, College Park.

Chen, C-H (2003) Integrated management of highway maintenance and traffic, Unpublished PhD Thesis, , University of Maryland, College Park.

Cheung, M (2017) The antecedents of safety leadership, Unpublished PhD Thesis, , University of Maryland, College Park.

Chung, B (2007) An analysis of success and failure factors for ERP systems in engineering and construction firms, Unpublished PhD Thesis, , University of Maryland, College Park.

Ding, Q (2018) Using social media to evaluate public acceptance of infrastructure projects, Unpublished PhD Thesis, , University of Maryland, College Park.

Eldukair, Z A R (1988) Safety assessment and optimization of construction operations based on fuzzy sets, Unpublished PhD Thesis, , University of Maryland, College Park.

Erfani, A (2023) Data-driven risk modeling for infrastructure projects using artificial intelligence techniques, Unpublished PhD Thesis, , University of Maryland, College Park.

Hao, J X (2007) Infrastructure investment and economic development, Unpublished PhD Thesis, , University of Maryland, College Park.

Hickey, P J (2023) A study of gender diversity in u.S. Architecture, engineering, and construction (AEC) industry leadership, Unpublished PhD Thesis, , University of Maryland, College Park.

Hsu, S-C (2013) A complexity-based approach to intra-organizational team selection, Unpublished PhD Thesis, , University of Maryland, College Park.

Hu, M (2022) Influence of project design team characteristics on construction cost of sustainable buildings, Unpublished PhD Thesis, , University of Maryland, College Park.

Ingraham, A T (2001) Bidder-auctioneer cheating in sealed-bid auctions, Unpublished PhD Thesis, , University of Maryland, College Park.

Jang, W S (2007) Embedded system for construction material tracking using combination of radio frequency and ultrasound signal, Unpublished PhD Thesis, , University of Maryland, College Park.

Karimi, S (2021) A systematic methodology for evaluating and balancing acceptance risks with pay factors for highway construction materials, Unpublished PhD Thesis, , University of Maryland, College Park.

Lessani, A (2016) Decision analysis in construction claims, Unpublished PhD Thesis, , University of Maryland, College Park.

Lu, R (2010) Impacts of local item dependence of testlet items with the multistage tests for pass-fail decisions, Unpublished PhD Thesis, , University of Maryland, College Park.

McCahill, D F (1990) A practical model for simulation of earthwork construction, with applications for scheduling, Unpublished PhD Thesis, , University of Maryland, College Park.

Mohieldin, Y A (1989) Analysis of construction processes with nonstationary work task durations, Unpublished PhD Thesis, , University of Maryland, College Park.

Moore, W B (1989) Modeling the impact of large construction projects on surrounding communities, Unpublished PhD Thesis, , University of Maryland, College Park.

Neely, L E (2017) Project scheduling disputes: Expert characterization and estimate aggregation, Unpublished PhD Thesis, , University of Maryland, College Park.

  • Type: Thesis
  • Keywords: disputes; scheduling; project manager; decision analysis; duration; best practice; project stakeholder; stakeholder; experiment
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/1927625683
  • Abstract:
    Project schedule estimation continues to be a tricky endeavor. Stakeholders bring a wealth of experience to each project, but also biases which could affect their final estimates. This research proposes to study differences among stakeholders and develop a method to aggregate multiple estimates into a single estimate a project manager can defend. Chapter 1 provides an overview of the problem. Chapter 2 summarizes the literature on historical scheduling issues, scheduling best practices, decision analysis, and expert aggregation. Chapter 3 describes data collection/processing, while Chapter 4 provides the results. Chapter 5 provides a discussion of the results, and Chapter 6 provides a summary and recommendation for future work. The research consists of two major parts. The first part categorizes project stakeholders by three major demographics: “position”, “years of experience”, and “level of formal education”. Subjects were asked to answer several questions on risk aversion, project constraints, and general opinions on scheduling struggles. Using Design of Experiments (DOE), responses were compared to the different demographics to determine whether or not certain attitudes concentrated themselves within certain demographics. Subjects were then asked to provide activity duration and confidence estimates across several projects, as well as opinions on the activity list itself. DOE and Bernoulli trials were used to determine whether or not subjects within different demographics estimated differently from one another. Correlation coefficients among various responses were then calculated to determine if certain attitudes affected activity duration estimates. The second part of this research dealt primarily with aggregation of opinions on activity durations. The current methodology uses the Program Evaluation and Review (PERT) technique of calculating the expected value and variance of an activity duration based on three inputs and assuming the unknown duration follows a Beta distribution. This research proposes a methodology using Morris’ Bayesian belief-updating methods and unbounded distributions to aggregate multiple expert opinions. Using the same three baseline estimates, this methodology combines multiple opinions into one expected value and variance which can then be used in a network schedule. This aggregated value represents the combined knowledge of the project stakeholders which helps mitigate biases engrained in a single expert’s opinion.

Negahban, S (2008) Utilization of enterprise resource planning tools by small to medium size construction organizations: A decision-making model, Unpublished PhD Thesis, , University of Maryland, College Park.

Nyakaana Blair, A M A (1999) Risk analysis of cost and schedule of complex engineering systems, Unpublished PhD Thesis, , University of Maryland, College Park.

Ordonez Arizaga, J F (2007) A methodology for project risk analysis using Bayesian belief networks within a Monte Carlo simulation environment, Unpublished PhD Thesis, , University of Maryland, College Park.

Owoyemi, J A (2018) Performance evaluation of higway transportation design-build project delivery: A case study, Unpublished PhD Thesis, , University of Maryland, College Park.

Parvan, K (2012) Estimating the impact of building information modeling (BIM) utilization on building project performance, Unpublished PhD Thesis, , University of Maryland, College Park.

Quadri, H A (2019) Value engineering decisioneering: A risk management tool in the project management office- case study of electricity distribution companies in Nigeria, Unpublished PhD Thesis, , University of Maryland, College Park.

Salgado, C A (2005) Construction project organizational structuring, Unpublished PhD Thesis, , University of Maryland, College Park.

Shafahi, A (2016) Mathematical model and framework for multi-phase project optimization, Unpublished PhD Thesis, , University of Maryland, College Park.

Sharma, D K (2012) Design of availabilty payment mechanism for public private partnerships, Unpublished PhD Thesis, , University of Maryland, College Park.

Sundararajan, S K (2004) Project performance-based optimal capital structure for privately financed infrastructure projects, Unpublished PhD Thesis, , University of Maryland, College Park.

Tatari, M O (2009) Empirical analysis of construction enterprise information systems: Assessing the critical factors and benefits, Unpublished PhD Thesis, , University of Maryland, College Park.

Vecino, G A (2016) The feasibility of using web-based technology for the management of dredging projects, Unpublished PhD Thesis, , University of Maryland, College Park.

Yang, N (2010) Optimization of highway work zone decisions considering short-term and long-term impacts, Unpublished PhD Thesis, , University of Maryland, College Park.

Zeng, Y (2010) Risk management for enterprise resource planning system implementations in project-based firms, Unpublished PhD Thesis, , University of Maryland, College Park.

Zhao, Y (2023) Sustainability, acceptance risk analysis and machine learning in assessing mechanical properties and the impact of highway materials in transportation infrastructure, Unpublished PhD Thesis, , University of Maryland, College Park.